*LAPORAN PRODUKSI PLANT* 3️⃣
Sabtu, 1 Januari 2021
( 08.00 s.d 20.00 )
*_GRADE NPK 13-6-27-4_*
*PERSONEL*
▪️Shift Leader : Andri
▪️Operator : 4 Orang
▪️Outsourching : 6 Orang
▪️Feeding : 5 orang CV NK
*Total Feeding 13-6-27-4*
[ ] Shift pagi panjang = 265.32 MT.
[ ] Shift malam panjang = MT.
[ ] Akumulasi Feeding = 265.32 MT.
Target Peduksi : 2000 MT.
To Date :594.16 + ( 265.32 + ) = MT.
Kekurangan Produksi (1140.52 ) MT.
*Pemakaian*
Tamol : ( 9 + )= cm
W. Clay : ( 3 + )= jumbo
T16 = 0 + = Bag
Ga = 0 + = Bag.
Carbon Black = 2+ = Bag.
Spillage : = ( 2 + ) = bucket
*PEMAKAIAN UTILITY*
• Power 400: ( 0.00744+ )= GWH
• Power Mix: ( 0.20766 + )= GWH.
• Power store : ( 0.1282+ )= MWH.
• Steam : ( 12.53+ )= Ton.
• Air PDAM : ( 0 + 0 )= 0 m³
• Air Reject 1 : ( 3+ ) = m³
• Air reject 2 : (20.8 + ) = m³
• LNG A : ( 1301.9 + )= m³
• LNG B : ( - + ) = m³
• Cos Phie : ( 0.97 , )
• Angin : ( 2610.18+ )= m³
• Air Fresh / scrubber: (11.43 + )= m³
• solar : - cm
NB :
[ ] MTC sudah perbaikn cv.629
Salam,
Produksi NPK 3